[F]uS!o[N]o![Z]e Cambodia China Iran Laos Thailand Turkey Vietnam [F]uS!o[N]o![Z]e Cambodia China Iran Laos Thailand Turkey Vietnam [F]uS!o[N]o![Z]e Cambodia China Iran Laos Thailand Turkey Vietnam [F]uS!o[N]o![Z]e Cambodia China Iran Laos Thailand Turkey Vietnam [F]uS!o[N]o![Z]e

Iran - Turkey


View Backpacking in Iran 2011 in a larger map
Showing posts with label Minutes. Show all posts
Showing posts with label Minutes. Show all posts

Monday, April 07, 2008

Minutes of meeting - 06/04/08

Residential Project
  • All to standardise - Primary School of Cat Cat San Sa Ho Near Sapa, Vietnam
  • Aim of project is to gather information and gain experience to be transform into materials for other batches going.
  • Three sections, Pre, Proper and Post Project.
  • Annexes - Slides, YSLA and BOOKLET

Physical Recreation

  • Kayaking to be used as the proper term.
  • Annexes - Receipts
  • All to have a general assessor report (3/4) while each of us is required to submit a short paragraph of inidividual assessment (1/4)
  • The rest who r not doing kayakin are to come up with their own assessor report by relevent people (or mr khoo if you dont have any)

Skills Report

  • Learning a musical Instrument - Guitar to be used as common term
  • Annexes are receipts is any.
  • Assessor report to by done by relevent people.

Adventurous Journey

  • Explorations to be used as common term.
  • Theme for investigation can vary from person to person
  • Annexes - slides and investigation
  • Day 1 - sapa - binh lu (4.5 hours)
  • Day 2 - binh lu - chu va - sapa (3 hours)
  • Day 3 - sapa - ta van - Giang ta chai - seo trung ho (8 hours)
  • Day 4 - seo trung ho - Ma guay ho - Ban ho (7 hours)
  • Day 5 - Ban Ho - Su Pan - Sapa (4 hours)

Service Report

  • No relevent annex
  • Assessor report to be a general one as well
  • Please ensure that you have sufficient hours

Note

  • Annexes to be labelled by section then annex number. (section 1 is service, annex 1= annex 1.1)
  • Section number to follow that of the booklet. (section 1 is service 2 is adventurous journey etc.)
  • All to hand in individual assessor report (with examples to support what u said)
  • Entries are to be re-written and not to be copied.

IMPORTANT NOTE

  • BOOKLET FOR THE SEC 3 GOING TO VIETNAM IS TO BE DONE UP AND ALL OF US TO TAKE THEM THROUGH IT IN ONE SESSION
  • no booklet no passing of residential project
  • Details of what u suppose to do please refer to previous posts
  • All materials to be converted to be in by 14 April latest
  • Itinery can be downloaded here

Meeting

  • Next meeting to be on 15 April 2008

Tuesday, March 25, 2008

Minutes of Meeting

Hi,

Though today only like half of the people turned up for meeting, i hope most of you now should feel the urgency to get your report done up by end of the mth or latest the next meeting.

The next meeting will either fall on 1st or 3rd April tuesday and thursday. Any objections please tell me. If both days really cannot it will be on that sunday den.

Otherwise, please hand in your assessor reports for AJ, RP and service(they will endorse for us) by this week so that it will be ready for collection by next week. I will only submit when at least half of you guys passed it to me, so dun drag the rest behind.

PLEASE HAVE YOUR WHOLE REPORT DONE UP BY NEXT MEETING

Thank You,
Zhan Liang

Monday, January 21, 2008

Minutes of Meeting - 21/1 Monday

General NYAA Report
  • Each section (there are 5 of them) are to have three sub-categories.
  • They are the main log, reflection and assessor report.
  • Main log can be in table format (if you have many dates of same entry) or any other format you find suitable but have to be organised
NYAA Physical Recreation Report
  • Final copy of main log and own reflection to be in as a single file by 31st Jan Thursday.
  • Assessor report to be submitted to Mr. Khoo by 31st Jan Thursday.
  • All these to be done with right format (your own nice format). This should be what you want to submit in the end (means complete with pictures and documentation if any)

NYAA Adventurous Journey Report

  • Research on minorities (you choose your own theme) to be in together with main log by second week of Feb where there will be another meeting
  • The research is an extra catergory apart from the three sub-category.

NYAA Residential Report

  • To be done by end of February.
  • Will be further discussed on the second meeting on the second week of Feburary

Extra Notes

  • If you have passed the deadline for submission the whole group will just continue with the next section so best if fix to deadline.
  • We will submit to the council by end march.

Laos Reflection

  • All reflection to be in by end of Jan.

Sunday, November 04, 2007

Meeting Minutes for 1st November 2007

MPFSC Service:

  • Deepavali cum Hari Raya celebrations proposal (I.C.s are Boon Kiat and Joseph) to be completed and given to Mr. Khoo on Saturday, 3rd November, for vetting and presented to MPFSC on Sunday, 4th November, for approval
  • Helping out at an event at MPFSC on Sunday, 4th November
  • Calvin and Chang Yang have already started off on their befriending
  • All remaining 3 pairs will be starting on Thursday, 8th November

Wong Wai Lit Post-trip Project:

  • Last dateline for everyone for handing-in of final proposal plans on Wednesday, 7th November
  • Implementation of project will be on 20th December, Thursday, and if need be will stretch for another day on the 27th December, Thursday

EOY Laos trip:

  • Confirmed only 5 people going, namely Boon Kiat, Edmund, Jiawei, Seth, Zhan Liang
  • Confirmed Thomas’s adventurous journey has been completed
  • Itinerary for the trip (several rejected due to safety concerns and being unfeasible, a good point to take note when coming up with our next one), as well as service plans, has yet been confirmed
  • All these will be planned out and confirmed asap
  • New I.C. for service section of the trip will be Edmund
  • AAR to be completed and sent to Jiawei by Sunday, 4th November, evening at 6 p.m. for compilation to be handed in to Mr. Khoo by Sunday night
  • EOY Laos trip group to meet again on Wednesday to discuss with Mr. Khoo with regards to the trip, the itinerary and service section, basically the confirmation of the details of the trip

Tuesday, October 23, 2007

Meeting Minutes for 19th October

Sorry for taking so long to put up the meeting minutes, there might be some mistakes within that would need you guys to correct, so please read through carefully and do what you should, Thanks!

JW

Service Section


IC: Seth

MPFSC befriending
for each individual to be carried out as soon as 1 day per week has been decided upon within the trio/pair. Inform Seth of the day when it has been confirmed, frequency is not limited to once per week or so. So far, most have decided on Thurs and Tues afternoons for their visitations.

Pairing up of Groups
For each individual under your charge, this is the current arrangement if I am not mistaken. (Edit this post if there are mistakes, Thanks)
Zhan Liang/Thomas/Edmund
Calvin/Chang yang
Jiawei/Seth
Boon Kiat/Joseph

Deepavali and Hari Raya Celebrations
We have to organize an event for the residents and members of Good Life during the months of Nov or Dec, ASAP as part of our requirements for our service section. Boon Kiat and Joseph will be Overall ICs and they will have to confirm with MPFSC (Seth) first the date which it is held, the roles assigned to us each for the preparation (eg. decoration of venue, performances etc) and also liaise with Xiao Hong for the planning details.

NOTE: MPFSC activity on 4th Nov (Sunday) from 830am to 2pm, all to be involved. Details such as attire and meeting venue to be decided later.

-Project WWL

IC: tentatively Calvin

Postponement of trip
The class has decided to go to Sapa in March 08' instead for their OCIP, thus we have to make changes to our workshop date in order to suit the change in plan. However, planning still remains a priority within the months of Oct and Nov as the JC2 year(eg. Term1 papers) will be too busy for us to undertake so many things at a go.

Planning Process
So far, all the proposals have been submitted and what needs to be done is to extract the ideas and put it into a proper plan for the execution of our workshop. We might have to carry out the workshop in the months of Nov and Dec if need be to ensure we have enough time next year, thus the planning cannot take a backseat yet if we aim to finish everything by this year.

- EOY Trip

IC: Jiawei

Route Planning
Due to time constraints, we cannot aim to finish the initial route in the itinerary planned by vermillion on a bicycle within 4D3N. Thus, the route has been changed from rounding the Bolaven Plateau to going up further north instead and rounding back to Pakse, which will take approx. 3D2N as it is much shorter. Everyone has been briefed on the new route change and have seen Thomas' new itinerary.

Overhead Costs
The costs so far have been only done up to the point where things have been confirmed (Check under:Manage posts; drafts by vermillion). Thus we would have to complete the full itinerary beforehand in order to come up with the compulsory costs for everyone to give a better estimate of our overheads.

Things Need Doing
new planning for the itinerary, our service project (i.e what are we going to do there),fund raising for our service in Laos (no matter how you look at it, we need money!). All these have to be discussed in order to move on to other more important things, such as our booking for lodgings and stuff like that. I will need everyone's cooperation on this if we want to have a smmoth trip without any difficulties.

NYAA Meeting this week has been decided either on WED, THURS or FRI.
The NYAA coordinator please confirm a date for us!!
Agenda:
1) MPFSC Confirmation of Visitations, Celebratory Event
2) Update on planning of Project WWL
3) EOY trip: assignment of roles, new itinerary, CIP section (practically have not started on this!)

Note: Guitar people, please remember to bring your AWARD DIARY (the smaller blue book) this FRI (26th Oct) during your last lesson for the assessor to sign, thanks. We will also settle the missing post of July 07 for our skills entry.

Monday, June 04, 2007

Meeting Minutes for 31st May

Adventurous Journey
  • Chang yang and Justin to be considered as participants for the trip. At the last vote, there were no objections
  • Confirmation details with parents on the trip
  • Jiawei to be expedition leader this time round due to the withdrawal from the YSL
  • Costs of trip to be around same as 2006 Fusionoize Vietnam, with approx. 700 dollars to be handed in to Mr Khoo.
  • Participants are to be responsible for their own safety as this would not be a school-based trip.
  • Participants must also be prepared for different expectations and are fully aware of the detailed preparation for the trip that they must undertake.
Tentative Itinerary (15 Days)

Day 1 SIN - BK
Depart: 1805 Arrival: 1930 (local time)
Dinner, BK orientation
1 Night accommodation

Note: we will not be able to take the train on the first day as we cannot make it in time due to the flight schedule

Day 2 BK (hualamphong) - Ubon Ratchathani
BK orientation, BLD till 1930
Depart: 2030 (Overnight train)

Day 3 Ubon Ratchatani - Chong Mek
Arrival : 0635 (Ubon)
Bus Ride (No. #1 ,#2 or #3) from Ubon to Warinchamrab market
Transfer bus ride to Phibun Mangsahan market (every 30min until 4.30pm)
Transfer bus ride to Chong Mek, the border town between Thailand and Laos
(every 40min- 90min)
Chong Mek - Laos (walk across, daily from 0600-1800)
Transfer pick-up/taxi ride to Ban Muang Kao (45–75min)
Boat ride across Mekong to Pakse

The rest of the itinerary here would be up to further planning as details have not been confirmed yet (eg. sightseeing, CIP project)
Day 4 Pakse - Sipandon (Muang Khong)
Day 5 Sipandon (Muang Khong)
Day 6 Sipandon (Muang Khong)
Day 7 Sipandon (Muang Khong)
Day 8 Sipandon (Muang Khong) - Pakse
Day 9 Pakse - Tad Lo (Biking?)
Day 10 Tad Lo - Pakse
Day 11 Pakse
Day 12 Pakse
Day 13 Pakse - Chong Mek - Ubon
Depart: 1830
Day 14 Ubon - BK
Arrival: 0525
BK orinetation, BLD
Day 15 BK orientation
BLD
Depart: 2000 Arrival: 2325

Saturday, April 28, 2007

Meeting Minutes for 26th April

Service Section; Marine Parade Family Service Centre(MPFSC)

  • Calvin to join the the MPFSC Project
  • MPFSC Dumpling Festival Event tentatively on the 13th of June or sometime in 3rd week of June.
  • Project will phase into stage where MPFSC sessions will be in smaller groups after a few more sessions as a whole group.
  • Allocation of groups will be based on similarity of timetables-hence most conveniently according to those in the same schools.

Residential Project

  • Youth Service Learning Award(YSL Award)

-Main participants for project would be those not going for the year end Vietnam Trip, it will mark the end point of the Residential Project for these participants.

-Proposal for submission for YSL Award will be based on 2006 Vietnam Trip.

-Proposal guidelines will be marked out by YSL Award.

-Deadline for YSL Award proposal: 8th June 2007

-Participants of project(subject to further addition): Calvin and Thomas

  • Year end trip to Vietnam will mark completion of the Residential Project for remaining non-participants of the YSL Award.

-Participants of year end trip : Zhan Liang, Jia Wei, Joseph, Seth , Boon Kiat, Edmund, Justin

Adventurous Journey

  • Calvin, Zhan Liang and Thomas will be using the VJC Overseas Trip in June for the completion of their Adventurous Journey aspect.
  • The Vietnam trek will act as the preliminary training for the three while the rest will use it to complete the Adventurous Journey.

Tuesday, February 27, 2007

Minutes of meeting for 27/2/07

Skills

We confirmed the skills for EVERYONE.
They are as follows:
  • Guitar Class
Participants: Joesph, Calvin, Jia Wei, Edmund and Boon Kiat.
Date: Every Thursday, starting from 01 Mar 2007
Time: 8.15pm - 9.00pm
Venue: Parkway Popular Bookstore Building
Other details: We have decided to contine with our lessons till we reach grade 3 after which, we will practise and improve by learning to play new songs.
  • Others

- Seth will continue with his piano lessons every Thursday.

- Zhan Liang to continue with his E&E

- Thomas to continue with swimming

Service Section

  • Tutorial Project

- Calvin will continue with his tutorial project in VS and will update us about his progress through the blog or during meetings.

  • MPFSC Project

With continuation of the last meeting when we decided to proceed on with elderly. Minutes of the meeting:

- We will be doing 'befriender service'. This includes the weekly visits to the houses of the elderly where we will interact and do some cleaning up for them.

- Apart from the weekly visits, we have decided to organise activities for them during special occasions eg. inviting them to National Day, CNY celebrations in Victoria School. Internal events can be also organised eg. Christmas party.

- Seth will be informing the MPFSC personnel on the agenda of our meeting on Friday, 2/3/07 His Email would generally include:

- Our activity scope: What our service would cover.

- Our commitment level: Number of sessions we can complete in a period of a month and the number of hours a session.

Physical Recreation Section

PR is confirmed for almost everyone apart from Boon Kiat.

  • Kayaking

Participant(s): Calvin, Jia Wei, Edmund, Seth, Zhan Liang

  • Keep Fit

Participant(s): Joesph and Thomas

No details as both are absent for the meeting.

  • Swimming/Keep Fit

Participant(s): Boon Kiat

PR will be confirmed latest by 16 Mar 2007. Note: PR lasts for 12 weeks (a.k.a 3 months)

Dates to Note:

28 Feb 2007: Meeting with Mr Khoo, 1600 in Victoria School.

01 Mar 2007: Guitar Lessons Starts

02 Mar 2007: Meeting with MPFSC personnel on Friday regarding our service section. (Calvin not required to be present for the meeting)

Thursday, February 22, 2007

Minutes of meeting for 22/2/07

Skills Section
  • lessons to start this mon, 26/2 at Marine Parade.
  • Participants are calvin, jia wei, boon kiat, joseph and edmund. (5 ppl)
  • zhan liang and thomas has completed and posted the required for january. (2 ppl)
  • Seth has just started on his piano lessons for year 2007. HE HAS YET TO POST WHAT IS REQUIRED OF HIM FOR YEAR 2006.

Service Section

  • Confirmation among ourselves that we will be doing elderly for our service section.
  • Talks will be held with MPFSC soon and details will be out by then.

Physical Recreation

  • There willl be a kayaking expedition at pasir ris SSC this sunday, 25/2.
  • Notice for expedition will be posted out soon.
  • Boon kiat is doing swimming for PR
  • Thomas is doing keep-fit and will be posting his januray submission by next wednesday, 28/2
  • People doing kayaking expedition (zhan liang, calvin, jia wei and edmund) are expected to finish their PR section by end of march/1st week of april.

Thursday, February 01, 2007

Minutes of meeting for 1/2/07

Venue: VS
Present: Mr Khoo, Zhanliang, Seth, Edmund, Boon Kiat, Thomas, Jiawei, Calvin
Absent: Joseph (Working)

Agenda:
- Service for all not doing tutorial
- Confirmation of how each is completing all his sections and roster for recording/posting

Service
- We will be doing with the Marine Parade Family Service Centre
- Zhanliang and seth will make a visit to the centre to look for the lady-in-charge to discuss possible forms of service that can be stretched upon a one-year period
- Suggested: once a week, probably interaction, games, tutoring etc.
- Roster for posting will be decided when more information is available

service looks at consistency, level of impact/outreach and extent of service to beneficiary

Skills
-
Piano (Taking up course)
Participants: Seth
Posting: Seth, once a month
-
Guitar (Grade 1 to most likely 3)
Participants: Calvin, Edmund, Jiawei, Boon Kiat, Joseph
Venue: Music School at Marine Parade Promenade Popular that building
Time/Day: Monday nights 45 min per session
Posting:
February - Calvin
March - Edmund

April - Jiawei
May - Boon Kiat
June - Joseph
July onwards will be decided later (in case we take a rest before grade one)
- Electricity and
Electronics (Job attachment with father)
Participants: Zhan Liang
Posting: Zhan Liang, once a month
-
Swimming (Competitive swimming under JC CCA)
Participants: Thomas
Posting: Thomas, once a month
- All those who are responsible to post each month please do note down EVERYTHING THAT WAS COVERED in EACH training session of the month, and NOT just report on ONE single training session

skill looks at element of prolonged skill acquistion (1.5years) and development (progress)

Physical Recreation
- Kayaking
Participants: Calvin, Seth, Jiawei, Zhan Liang, Edmund, Boon Kiat
Posting:
Expedition 1 - Jiawei
Expedition 2 - Calvin
Expedition 3 - Zhan Liang
Expedition 4 - Edmund
Expedition 5 - Seth
further expeditions will be decided later. if poster is absent, someone else would replace him
- Keep-fit
Participants: Joseph, Thomas
Posting: since both are doing it individually, each will post once a month

physical recreation looks at consistency and commitment


Friday, January 26, 2007

Minutes of meeting for 25/01/07

What to do with the tiger credits
  • going to use it for another vietnam trip at end of 2007
  • there will be a four day three night adveturous journey in it
  • and also another residential project

Confirming of skills section

  • calvin, boon kiat, edmund and joseph are going to do guitar course at marine parade
  • zhan liang is doing electricity and electronics
  • seth is doing piano
  • thomas is doing swimming
  • jia wei is unconfirmed

Confirming of service section

  • calvin is doing tutorial
  • boon kiat, zhan liang, edmund, jia wei, seth and thomas are doing katong special school (KSS)
  • joseph is unconfirmed

Confirming of physical recreation section

  • jia wei, edmund, zhan liang, calvin and seth are doing kayaking
  • thomas and joseph are doing keep-fit
  • boon kiat is unconfirmed

Friday, December 29, 2006

Meeting Minutes for 29th December

NYAA

1.Residential Project

  • Initiation of project begins with today's Fund raiser
  • Basis of project is to provide a platform to aid other C.I.P project based on the personal experience gathered from the trip to Vietnam
  • The project will require setting up a schedule for the C.I.P project and the schedule will depending on the target group i.e. the people undertaking the the C.I.P project
  • We will seek to develop clientele in schools
  • Hence this would provide a template for C.I.P in Vietam.
  • A template for C.I.P trips to Vietnam would :
  1. Make the prospect of such a trip less daunting
  2. It would allow Vietnam to be a location ready for such projects as our trip to Vietnam had been a suitability assesment in which our personal experience would have contributed to the template
  3. The template for C.I.P projects would be in the form of a portfolio completed as a proposal

2. Adventurous Journey

  • Pulau Ubin cycling trip, kayakking( 1 star and 2 stars), and the life-saving course as preliminary training
  • This ensures a minimum of at least 2 entries under preliminary training for the Adventurous Journey
  • For the actual adventurous journey, the 2 days of biking and the immediate 3 days of trekking(according to planned itinery)
  • Do Exploration segment consisting of :
  1. Evaluating the circumstance of the people
  2. Improving those circumstances
  • Do a report and journalling to complete the exploration segement of the NYAA Gold.
  • When journalling, always focus and link writing to the 2 parts of the exploration segment.

3. Service

  • Service segment can be completed through leadership mentoring
  • or Tutorial(academics) sessions

Sunday, December 24, 2006

Meeting Minutes for 20th December

Agenda for meeting

  • Ascertain execution of business proposal(travel agency) for Vietnam trip
  • Role assignment for portions of the business proposal
  • Brain storm for ideas on proposal and implementation of it
  • Source for practical and unique aspects to manage and market travel agency
  • Fix deadline for proposal

1. List of services

  • Cater to walk-in backpackers
  • Exploration around Sapa(mountain villages ) via a jeep
  • Biking to villages
  • Mountain climbing
  • Trekking
  • Minority people's homestay
  • Tubing
  • Outdoor activity certification
  • Hotel Reservations
  • Leisure Trips/Holiday
  • Expert assistance in C.I.P based projects
  • Educational trips
  • Local interaction (e.g. Sports)

2. Features

  • Affordable and reasonable rates
  • Customised individual tours
  • Personal guide (at least a minimum of 2 people)
  • Multi-Lingual guide
  • Good rapport with minority people to aid interaction and immersion with local culture
  • Internet services provided
  • Cater to special diet requirements
  • Availability of electrical amenities (e.g. heater etc)
  • Shopping recommendations
  • Affiliated tours throughout Vietnam
  • Welcome gifts
  • Value-added service
  • Service with initiative

3. Focus

  • Educational trips
  • C.I.P projects
  • Adventurous journeys

4. Marketing concepts

  • Hook up with possible Singapore tour agencies interested with working affiliations
  • Register with related agencies to and evaluate approve educational tours
  • Liase with schools to source for potential clients
  • Set up a website as a means for public communications
  • Brochure
  • Word-of-Mouth publicity e.g. MSN
  • Write to NGOs and get endorsement
  • Media

5. Travel Agencies motto

  • Experience- To provide comprehensive and unique activities in Vietnam which is fun, enriching and educational. To immerse people into the lifestyles and cultures of the minority peoples for a truly personal and unique experience. This would allow an extra edge over common travel agencies as this would not simply be a touch-and-go experience but instead something which will stay with people even as they leave. Such an intimate experience with the culture of the minorities in Vietnam is not something easily obtainable, and yet we can guarantee this much. Therein lies our value-addedness in terms of experience.
  • Exposure- To provide interaction with the local minority peoples and the exploration of the rich cultures in Vietnam. To also acquaint people with the panoramic landscape of Vietnam. The exposure in this instance is not simply a walk along the oft-taken routes but a hard trek along the mountainous areas used only by the locals. These routes will allow people to view the Tonkinese alps in all their splendour, further enriching their discovery of Vietnam. The interaction with the minority peoples-the locals-will prove to be unique as our guides have great rapport amongst them, allowing for a higher level of social exchange. The exposure in terms of the physical landscape and social interaction will prove to be extraordinarily unique in every sense.
  • Education- To provide experience and exposure through the professionalism of the tours by the travel agency. The guides at the travel agency are one of the best in the business and can ensure satisfaction at every level of expectation. From the great outdoors to common interaction, one can be assured that they are the most adept at what they do. Their expertise allows the people they serve the greatest overseas travelling experience, meeting the needs of the people beyond what is asked and expected.

6. Target Group

  • Students(12pax)
  • Walk-in bagpackers

7. Assumed purpose of trip for students(possibly main target group)

  • Inculcate values e.g National Education, independence etc
  • To educate the main student body on things learnt from the trip as student representatives
  • To learn of the different ethnic minorities in different countries i.e Vietnam

8. Means of educating the target groups

  • Work booklets for filling in

9. Elaboration on niche area i.e educational trips and C.I.P Projects

  • Comprehensive planning of trips to prevent a mismatch of reality versus planning
  • Allow smooth flow of C.I.P projects, meaning areas and resource will be sourced out ahead of time for C.I.P Projects
  • Precautions taken: We will act as the go-between to coordinate the conditions for C.I.P projects and how much assistance will be rendered. This ensures a balance of work is still done.

Thursday, September 28, 2006

Updates regarding the Meeting Minutes of the 26th of September

Do take note that the Meeting Minutes of the 26th of the September has been duly ammended after some mistakes were noted. Please make reference to the amendments.

Wednesday, September 27, 2006

Meeting Minutes 26th September 2006

Meeting Minutes
Date: 26th September 2006

AGENDA:


1.) Target and Aims shaping Vietnam trip
ü I.D.E.A:
· Intellectual Components-Growth in knowledge and grasp of the culture etc.
· Deliverables-Tasks that are drawn up to accomplish during the group
· Emotional Components-Emotional Growth in terms of relating to foreign peoples
· Adversity-Learning to overcome the on-the-spot obstacles
· Sensibility-Acquisition of practical experiences for growth of independence


2.) Role/Posts Assignments
ü Expedition Manager - Chan Zhan Liang
ü English Library Project I.Cs - Edmund Cai and Thomas Leong
ü School Aesthetics Project I.C - Joseph Sng
ü English Teaching Project I.Cs - Calvin Han and Seth Koh
ü Stationery Distribution Project I.C - Chua Boon Kiat
ü Preliminary Preparation/Training I.C – Zhang Jia Wei
ü Secretariat – Seth Koh


3.) Roles/Assignment Awareness
ü Each post holder is to post a blogpost on his respective role, listing out the job requirements within his purview



4.) Procurement of Resources
ü Raising of Funds to purchase stationery in Vietnam - more cost efficient
ü Liaise with companies for donations of books and stationeries
ü Participants to liaise with teachers for donations of required books
· Respective student-teacher liaison I.Cs:
o Zhang Jia Wei – Mrs. Bala
o Edmund Cai – Mr. Zulhilmi
o Calvin Han – Madam Nabilah
o Seth Koh – Ms. Sharma
o Thomas Leong – Mr. You
o Joseph Sng and Chua Boon Kiat – Madam Tazneen
o Chua Boon Kiat – Madam Kwok
o Chan Zhan Liang - Mr. Richard Phua
ü Liaising with Primary School Bookshops
· Pioneer Bookshop to provide list of items to be given for trip by nexdt month.
· Respective student-school liaison I.Cs
o Seth Koh and Edmund Cai – Yu Neng Primary School
o Zhang Jia Wei – Elias Park Primary School
o Chan Zhan Liang – St. Gabriel's Primary School
o Chua Boon Kiat and Joseph Sng – JunYuan Primary School
o Thomas Leong – Jing Shan Primary School
o Calvin Han – Tao Nan Primary School
ü Posters for Library Aesthetics Project to be bought in Vietnam from Funds raised
ü Funds will be raised though sale of Victorian Year Books during Sec 1 Orientation and Open House
· Date: End October and 28th December respectively
ü Inter-School bilateral relations gift - Victorian Year Book

5.) Immunization
ü Obtain individual immunization jabs at own time



6.) School Residential Project
ü Aesthetics aspect of project will be handled by Joseph Sng
· Theme for school layout and decorations to be decided by Joseph Sng
· Designs for school to be gotten from Vietnamese children
ü System for integration of books into library to be decided by English Library Project I.Cs - Edmund Cai and Thomas Leong


7.) Preliminary Training
ü Self implementation and documentation of training leading up to trip to prepare for trip
ü Pre-trip training at Pulau Ubin
ü Vertical Training

Sunday, September 03, 2006

Meeting Minutes! The very first!

Meeting Minutes
Date: 31st August 2006



Agenda

Execution of Residential Project
-> Methods discussed:
· Doing a Case Study of Sapa,Vietnam
· Doing a documentary of Sapa,Vietnam
· The selling of Sapa handicraft-with proceeds for indigenous people-in Singapore in capacity of a middleperson.
· To actively participate in preservation of eco-tourism by looking after beaches in Vietnam.

-> Method explored: Documentary and Case Study on Sapa, Vietnam

-> Roles assigned :

· Liaison Officer(s)
· Fund Raising Officer(s)
· Logistics I.C
· Planning Head
· Administrative Officer